Service overview

What a written scheme does

What it is

A written scheme of control is the document that turns your risk assessment into a practical plan. It describes your water system, sets out the control measures, lists every check with its frequency, names who is responsible, and explains what to do if results go wrong. Ongoing management is the work of keeping that scheme running and up to date.

Who it's for

Written schemes are needed where the risk assessment shows a reasonably foreseeable risk. That covers most commercial buildings, including healthcare, schools, golf clubs and offices, and some larger residential portfolios.

When you need it

A scheme should be put in place once a risk assessment is complete, and reviewed whenever the assessment, the building, or the people responsible change.

Why use a specialist

A scheme is only useful if people can follow it. We write clear, structured schemes and can run the ongoing monitoring programme ourselves, drawing on 20 years of Legionella control experience. Our approach follows HSE ACoP L8 guidelines.

The risk

What goes wrong without a clear scheme

Without a written scheme, control depends on memory and goodwill. Tasks get missed, responsibilities become unclear, and when staff change, knowledge leaves with them.

Inspectors expect to see a written scheme where there is a foreseeable risk. Missing or unclear schemes make it hard to prove control and can lead to enforcement action. Gaps in control also leave occupants exposed.

Common mistakes we see

  • Using a generic template that does not match the actual system.
  • Not naming a responsible person or deputy.
  • Setting checks but never reviewing results.
  • Letting the scheme go out of date after building changes.
  • Having no plan for what to do when results fall outside limits.

Service requirements

Discussing your written schemes & ongoing management requirements.

The scope, schedule, checks and any reporting or handover requirements are agreed for your property at quote stage.

  1. Step 1

    Review the assessment

    We start from your current risk assessment, or carry one out.

  2. Step 2

    Draft the scheme

    We document the system, control measures, checks and responsibilities.

  3. Step 3

    Agree and hand over

    Handover arrangements and responsibilities are agreed as part of the service.

  4. Step 4

    Run the programme

    Our team can carry out the ongoing monitoring and checks.

  5. Step 5

    Review and update

    Review and update arrangements are agreed as part of the service.

Benefits

What you get.

Clear responsibilities

Everyone knows what they are responsible for.

Scheduled responsibilities

Every check has a frequency and an owner.

Continuity

Documented responsibilities can support continuity when staff change.

Inspection-ready

A clear, current scheme to show inspectors.

Less admin

We can run the programme and keep records for you.

Defined response

A plan for what to do when results go wrong.

In detail

What goes into a written scheme

Every scheme is built around your building and your people.

System description

An up-to-date description of the water system, including storage, water heaters, distribution and outlets, so anyone can understand how it works.

Control measures and checks

The specific measures that control the risk, such as temperature control and flushing, and the checks needed, with frequencies and acceptable limits.

Roles and responsibilities

Who is the responsible person, who deputises, and who carries out each task, whether in-house staff or our team.

Corrective actions

What happens when a check shows a problem: who is told, what action is taken and how it is recorded.

Ongoing management

We can carry out monitoring, temperature checks, inspections and reviews as an ongoing service, so the scheme is followed in practice.

Guide

Making your written scheme work in the real world

HSE's ACoP L8 expects duty holders to have a written scheme for preventing or controlling the risk where one has been identified. The scheme should be specific and detailed enough to put into practice. It should explain the system, the control methods, the checks to be carried out, how often, by whom, and what to do if things go wrong.

A scheme is not something you write once and file. It needs to be reviewed when the risk assessment changes, when the system is altered, or when results suggest control is not working. It also needs to be followed, which means the people named in it must know what they are responsible for and have the time to do it.

A written scheme may be well prepared but ineffective if it is not put into practice or maintained. Ongoing management solves this. We carry out the scheduled checks, keep the records, review results and update the scheme so it stays accurate.

This works particularly well for organisations without a dedicated estates team, such as schools, golf clubs and smaller office buildings, and for landlords with several properties. You keep oversight and responsibility, while we carry out the detailed work.

Clear records are a key part of ongoing management. Records of monitoring, inspections, remedial work and reviews should be kept so you can show inspectors, insurers and auditors that your scheme is in place and working.

Whether you are in Hertfordshire, Bedfordshire, Buckinghamshire or further afield, we can review your current documents and give you a clear plan for bringing your scheme up to date.

What a good written scheme looks like for your building

Healthcare facilities need detailed schemes that reflect higher temperature targets, more frequent checks, and clear escalation routes when results are outside limits. Responsibilities across estates, clinical and management teams must be clearly defined.

Schools need schemes that cover term time and holidays, with named staff for day-to-day tasks and clear instructions for caretakers and site managers. Governors and business managers need simple summaries to show the duty is being met.

Golf clubs often rely on volunteers and part-time staff. A clear, simple scheme, with us carrying out the technical checks, removes the burden from committee members to support the club's Legionella management.

Office buildings and landlords need schemes that cover shared areas, plant rooms and individual units, with clear lines of responsibility between landlord and tenant where relevant.

Wherever you are, the scheme should be readable by the people who need to follow it. We avoid jargon, keep instructions practical, and make sure the scheme matches the building as it is today. Review and update arrangements are agreed as part of the service.

Book a free site visit

FAQs

Written Schemes & Ongoing Management: your questions answered.

07398 411881

8am – 8pm, Monday – Sunday

How much does a written scheme cost?

+

It depends on the size and complexity of your system. Initial site visits and Legionella quotes are free. We provide detailed quotations.

Are initial site visits and Legionella quotes free?

+

Yes. Initial site visits and Legionella quotes are free. We provide detailed quotations.

Do I need a written scheme?

+

If your risk assessment identifies a reasonably foreseeable risk, a written scheme of control is expected. We'll advise based on your assessment.

Can you run the scheme for us?

+

Yes. We provide ongoing management, carrying out the monitoring and checks and keeping records.

How often is the scheme reviewed?

+

Whenever the assessment, the system or the responsible people change, and as results show it needs adjusting.

Can you take over from another provider?

+

Yes. We review your existing documents and records and take over ongoing management.

Do you cover Hertfordshire and Bedfordshire?

+

Yes, along with Buckinghamshire, Northamptonshire, Cambridgeshire, Milton Keynes and nationwide.

What is the difference between a risk assessment and a written scheme?

+

The risk assessment identifies the risks. The written scheme is the plan for controlling them: what is checked, how often, by whom, and what happens if results go wrong.

Who is the responsible person?

+

The person appointed to take day-to-day responsibility for managing Legionella control. The written scheme should name them and a deputy, and set out what they are responsible for.

When can you attend?

+

We're available 8am to 8pm, seven days a week, which makes it easier to schedule work around your opening hours. Call 07398 411881.

Free site visit

Make your Legionella duty simple to manage.

Book your free site visit for written schemes & ongoing management. Initial site visits are free; the proposed work and terms are set out in a detailed quotation.

07398 411881

isaac@imwhs.com · 8am – 8pm, Monday – Sunday

  • Free initial site visits and Legionella quotes
  • Gas Safe Registered · £5m public liability
  • Warranty on remedial plumbing and boiler installations; terms at quote stage